Rapid Pengerang SHO / SSS / Scaffold Crane Operator By Dr Muzzafar in Clinic Johor Malaysia

Rapid Pengerang SHO / SSS / Scaffold Crane Operator By Dr Muzzafar in Clinic Johor Malaysia

Rapid Pengerang SHO / SSS / Scaffold Crane Operator By Dr Muzzafar in Clinic Johor Malaysia

Another mega-project within PIPC is PETRONAS’ RM60 billion Refinery and Petrochemical Integrated Development (RAPID) Project. RAPID will have a 300,000 barrels per day refining capacity while additional petrochemical plants will generate value to petroleum products produced in RAPID. The RAPID project will enable Petronas to meet this demand for the next 20 years.

Required Tests:

  • OHD
  • URINE TEST
  • BLOOD TEST
  • X-RAY

>> GET QUOTATION HERE

Search: offshore, onshore, medical exam

Share this post